Electricity produced in Pakistan is from three main sources.
1). Hydal 2). Thermal (Gas/Steam/Furnace Oil) 3). Nuclear
There are four major power producers in country which include Water & Power Development Authority (WAPDA), Karachi Electric Supply Company (KESC), Independent Power Producers (IPPs) and Pakistan Atomic Energy Commission (PAEC).
Below is the break-up of the installed capacity of each of these power producers (as of June-2008).
1). WAPDA
a). WAPDA Hydal
|
- Terbela 3478 MW
- Mangla 1000 MW
- Ghazi-Brotha 1450 MW
- Warsak 243 MW
- Chashma 184 MW
- Dargai 20 MW
- Rasul 22 MW
- Shadi-Waal 18 MW
- NandiPur 14 MW
- Kurram Garhi 4 MW
- Renala 1 MW
- Chitral 1 MW
- Jagran (AK) 30 MW
Total hydal ==> 6461 MW
b). WAPDA Thermal
- Gas Turbine Power Station, Shadra 59 MW
- Steam Power Station, Faisalabad 132 MW
- Gas Turbine Power Station, Faisalabad 244 MW
- Gas Power Station, Multan 195 MW
- Thermal Power Station, Muzaffargarh 1350 MW
- Thermal Power Station, Guddu 1655 MW
- Gas Turbine Power Station, Kotri 174 MW
- Thermal Power Station, Jamshoro 850 MW
- Thermal Power Station, Larkana 150 MW
- Thermal Power Station, Quetta 35 MW
- Gas Turbine Power Station, Panjgur 39 MW
- Thermal Power Station, Pasni 17 MW
Total Thermal ==> 4811 MW
WAPDA's Total Hydal + Thermal capacity is 11272 MW.
2). Karachi Electric Supply Company
- Thermal Power Station, Korengi 316 MW
- Gas Turbine Power Station, Korengi 80 MW
- Gas Turbine Power Station, SITE 100 MW
- Thermal Power Station, Bin Qasim 1260 MW
Total (KESC) ==> 1756 MW
3). Independent Power Producers (IPPs)
- Hub Power Project 1292 MW
- AES Lalpir Ltd, Mahmood Kot MuzaffarGarh 362 MW
- AES Pak Gen, Mahmood Kot MuzaffarGarh 365 MW
- Altern Energy Ltd, Attock 29 MW
- Fauji KabirWala Power Company, Khanewal 157 MW
- Gul Ahmad Energy Ltd, Korengi 136 MW
- Habibullah Coastal Power Ltd 140 MW
- Japan Power Generation, Lahore 120 MW
- Koh-e-Noor Energy Ltd, Lahore 131 MW
- Liberty Power Limited, Ghotki 232 MW
- Rousch Power, Khaniwal 412 MW
- Saba Power Company, Sheikhpura 114 MW
- Southern Electric Power Company Ltd, Raiwind 135 MW
- Tapal Energy Limited, Karachi 126 MW
- Uch Power Ltd, Dera Murad Jamali, Nasirabad 586 MW
- Attock Gen Ltd, Morgah Rawalpindi 165MW
- Atlas Power, Sheikhpura 225 MW
- Engro Energy Ltd, Karachi ----- MW
- Kot Addu Power Company Limited (Privitized) 1638 MW
Total (IPPs) ===> 6365 MW
4). Pakistan Atomic Energy Commission
- KANUPP 137 MW
- CHASNUPP-1 325 MW
Total (Nuclear) ===> 462 MW
Hydal Electricity generated by WAPDA varies between two extremities i.e. between minimum of 2414 MW and maximum of 6761 MW depending upon the river flows through the whole year.
Total Power Generation Capacity of Pakistan (including all sources) is 19855 MW and the electricity demand is 14500 MW and PEPCO is merely generating 10000 MW.
So it is obvious that these hours of power shutdowns in most parts of the country are not because of the lack of generation capacity but only because of the corruption & incompetence and a well designed idea to collapse the economy of the country that's why the business has been ordered to close down by 8 in the evening. in hot summers when people can only shop at nights, shops have been closed down.may Allah safe us from traitors rulers who have been placed to destroy us but i have firm belief that Saver is more powerful then spoiler.
|
|
|
|