Where is the shortage? Fact Sheet

Electricity produced in Pakistan is from three main sources.

1). Hydal
2). Thermal (Gas/Steam/Furnace Oil)
3). Nuclear

There are four major power producers in country which include Water & Power Development Authority (WAPDA), Karachi Electric Supply Company (KESC), Independent Power Producers (IPPs) and Pakistan Atomic Energy Commission (PAEC).

Below is the break-up of the installed capacity of each of these power producers (as of June-2008).

1). WAPDA

a). WAPDA Hydal
  •   Terbela                                                 3478  MW
  • Mangla                                                               1000  MW
  • Ghazi-Brotha                                                       1450  MW
  • Warsak                                                               243  MW
  • Chashma                                                            184  MW
  • Dargai                                                                 20  MW
  • Rasul                                                                  22  MW
  • Shadi-Waal                                                          18  MW
  • NandiPur                                                             14  MW
  • Kurram Garhi                                                        4  MW
  • Renala                                                                 1  MW
  • Chitral                                                                 1  MW
  • Jagran (AK)                                                        30  MW
         Total hydal                                               ==>   6461 MW

b). WAPDA Thermal
    • Gas Turbine Power Station, Shadra                 59  MW
    • Steam Power Station, Faisalabad                    132   MW
    • Gas Turbine Power Station, Faisalabad          244   MW
    • Gas Power Station, Multan                             195   MW
    • Thermal Power Station, Muzaffargarh           1350   MW
    • Thermal Power Station, Guddu                     1655   MW
    • Gas Turbine Power Station, Kotri                   174   MW
    • Thermal Power Station, Jamshoro                  850   MW
    • Thermal Power Station, Larkana                    150    MW
    • Thermal Power Station, Quetta                        35   MW
    • Gas Turbine Power Station, Panjgur                 39   MW
    • Thermal Power Station, Pasni                           17   MW
Total Thermal                                         ==>   4811   MW

WAPDA's Total Hydal + Thermal capacity is 11272 MW.


2). Karachi Electric Supply Company
    • Thermal Power Station, Korengi                  316  MW
    • Gas Turbine Power Station, Korengi              80  MW
    • Gas Turbine Power Station, SITE                 100  MW
    • Thermal Power Station, Bin Qasim             1260  MW
Total (KESC)                                      ==>    1756  MW
3). Independent Power Producers (IPPs)
 
    • Hub Power Project                                                            1292  MW
    • AES Lalpir Ltd, Mahmood Kot MuzaffarGarh                  362 MW
    • AES Pak Gen, Mahmood Kot MuzaffarGarh                    365  MW 
    • Altern Energy Ltd, Attock                                                   29  MW
    • Fauji KabirWala Power Company, Khanewal                    157  MW
    • Gul Ahmad Energy Ltd, Korengi                                      136  MW
    • Habibullah Coastal Power Ltd                                           140 MW
    • Japan Power Generation, Lahore                         120 MW
    • Koh-e-Noor Energy Ltd, Lahore                                       131 MW
    • Liberty Power Limited, Ghotki                                          232 MW
    • Rousch Power, Khaniwal                                                  412 MW
    • Saba Power Company, Sheikhpura                                  114 MW
    • Southern Electric Power Company Ltd, Raiwind            135  MW
    • Tapal Energy Limited, Karachi                                        126  MW
    • Uch Power Ltd, Dera Murad Jamali, Nasirabad               586 MW
    • Attock Gen Ltd, Morgah Rawalpindi                              165MW
    • Atlas Power, Sheikhpura                                                225  MW
    • Engro Energy Ltd, Karachi                                         -----   MW
    • Kot Addu Power Company Limited (Privitized)          1638  MW
 
Total  (IPPs)                                                    ===>   6365  MW
4). Pakistan Atomic Energy Commission
    • KANUPP                                                                    137 MW
    • CHASNUPP-1                                                            325  MW
Total (Nuclear)                                                 ===>   462  MW


Hydal Electricity generated by WAPDA varies between two extremities i.e. between minimum of 2414 MW and maximum of 6761 MW depending upon the river flows through the whole year.

Total Power Generation Capacity of Pakistan (including all sources) is 19855 MW and the electricity demand is 14500 MW and PEPCO is merely generating 10000 MW.

So it is obvious that these hours of power shutdowns in most parts of the country are not because of the lack of generation capacity but only because of the corruption &  incompetence and a well designed idea to collapse the economy of the country that's why the business has been ordered to close down by 8 in the evening. in hot summers when people can only shop at nights, shops have been closed down.may Allah safe us from traitors rulers who have been placed to destroy us but i have firm belief that Saver is more powerful then spoiler.